Cost
$471m
$471,007,794.43
Objective
Pre-identified projects on the Core Network corridors Description
Upgraded line / New-build line (ABS/NBS) Karlsruhe - Basel with partial upgrade measures on the existing line Finance
$193250077.45 investment
Connecting Europe Facility (CEF)/EU
Government