Ekibastuz GRES-2 Power Plant Project

power

Cities

Ekibastuz
Kazakhstan

Cost

$0.7b
$700,000,000

Phases

underConstruction, 2027

Objective

Description

The Ekibastuz GRES-2 Unit 3 Expansion Project aimed to construct a third generating unit at the existing Ekibastuz GRES-2 Power Station in northeastern Kazakhstan. Located within the Ekibastuz coal basin, one of the largest coal-producing regions in Central Asia, the project sought to expand the station's installed capacity by 630 MW, increasing total capacity from approximately 1,000 MW to 1,630 MW. The project forms part of Kazakhstan's strategy to strengthen domestic electricity generation and support industrial and mining activities in the country's northern energy corridor.

Finance

logo
$400000000 loan
China Development Bank Development bank
logo
$300000000 loan
Vnesheconombank Bank

Operators

logo
Samruk Energy JSC
Company

Contractors

logo
China Machinery Engineering Corporation
Company