Atlas Corridor
Component

New Suez Canal

waterway

Cities

Suez
Egypt
Port Said
Egypt
Ismailia
Egypt

Distance

72km
new
72km
rehabilitated
– km
existing
– km

Cost

$8.5b
$8,500,000,000

Phases

operational, 2015

Objective

The primary objective of the New Suez Canal was to double the waterway's daily capacity from 49 to 97 ships by 2023. By introducing two-way transit, Egypt aimed to slash vessel waiting times from 11 hours to 3 hours. Economically, the government sought to more than double annual transit revenues to $13.2 billion by 2023, while transforming the surrounding canal zone into a global logistics and manufacturing hub. Strategically, the expansion aimed to boost Egypt's geopolitical influence, stimulate national employment, and ensure the canal remained competitive against rival international shipping routes.

Description

The New Suez Canal opened on August 6, 2015, as a major expansion of Egypt's historic waterway. The project added a new 35-kilometer (22-mile) shipping lane parallel to the existing canal and deepened a 37-kilometer section to allow larger vessels. This expansion enabled two-way traffic for the first time along crucial stretches, significantly modernizing global maritime trade routes. Built in just one year under President Abdel Fattah el-Sisi, the fast-tracked megaproject symbolized a massive national achievement. It successfully eliminated long bottlenecks, securing the canal's position as a vital corridor connecting European and Asian markets.

History

Canal since 1869, new lane 2015. President El-Sisi explicitly refused foreign loans or international financing to maintain national sovereignty over the waterway

Capacities

97 Ships Per day

Finance

logo
$ investment
Arab Republic of Egypt Government

Operators

General Authority for Suez Canal Economic Zone
Company

Contractors

logo
National Marine Dredging Company
Company
logo
Orascom Construction
Company