Robeiki – 10th of Ramadan – Belbeis rail line (GCA)
railway
Cities
Badr City
Egypt
10th of Ramadan City
Egypt
Bilbeis
Egypt
Distance
63km
new
63km
rehabilitated
– km
existing
– km
Cost
$237
$237
Phases
underConstruction, 2028
Objective
The primary objective of this line within the broader El Sokhna–Alexandria Logistics Corridor is to act as a high-capacity inland bypass that seamlessly links the Red Sea and Mediterranean maritime trade routes. By connecting the 10th of Ramadan Dry Port to key regional junctions, the rail line enables freight arriving at the Port of Ain Sokhna to be rapidly sorted and transported North-West toward Alexandria without entering the heavily congested Cairo railway hub. This integration accelerates container transit times across the corridor, expands Egypt's domestic land-bridge capacity, and establishes a highly efficient, lower-emission logistical spine for international supply chains.
Description
The Robeiki – 10th of Ramadan – Belbeis rail line is a 63.5-kilometre strategic railway project in Egypt designed to connect major industrial zones and the 10th of Ramadan Dry Port directly to the national rail network. Funded through a €215 million partnership between the Egyptian government, the French Development Agency (AFD), and the European Bank for Reconstruction and Development (EBRD), the project features a 7-station layout linking the existing Suez and Port Said lines. A consortium led by Alstom is delivering the line's advanced signalling and digital infrastructure, which will support both heavy freight operations and regional commuter transit.
Finance
$125000000 investment
Arab Republic of Egypt
Government
$80000000 loan
French Development Agency
Development bank
$40000000 loan
European Bank for Reconstruction and Development
Development bank