Objective
The new terminal will be an extension of the existing Port of Douala
Description
The construction on the right bank of the Wouri River of a 900-meter-long dock and a 42-hectare bulk terminal. Finance
$147500000 loan
African Export-Import Bank
Bank
Operators
Kharam Trading Holding
Company