Cost

$155m
$155,000,000

Phases

underConstruction,

Objective

First of all, it was the idea of a refinery before projects such as a 600,000-tonne cement plant came together, a 60 MW power plant, a naval repair area, a metallurgical plant, a 300,000 m3 oil depot, and possibly the 767 km long pipeline terminal from the Somali Region of Ethiopia.

Description

The Djibouti Damerjog Industrial Development Free Trade Zone (DDID FTZ) is an industrial free zone project focused on heavy industry including oil, gas, ship repair, and livestock.

Finance

logo
$ loan
African Export-Import Bank Bank

Operators

logo
Djibouti Ports and Free Zones Authority