Atlas Corridor
Component

Tazama Pipeline Upgrade

pipelineOil

Cities

Dar es Salaam
Tanzania, United Republic of

Distance

1710km
new
– km
rehabilitated
1710km
existing
– km

Cost

$400m
$400,000,000

Phases

planned, 2027

Objective

With the loan, Sunyama says that the company will be able to upgrade the entire pipeline to a diameter of 12 inches and consequently this would increase the capacity of the pipeline to approximately 1.1 billion liters a day. (Source: https://furtherafrica.com/2020/05/28/tazama-pipelines-seeks-loan-to-upgrade-tanzania-zambia-crude-oil-pipeline/)

Description

The Tazama pipeline connects the Tanzania International Petroleum Reserves Limited (TIPER) in Dar es Salaam to the Indeni refinery in Ndola, Zambia. The pipeline is designed to carry 1.1 million tonnes per year and is owned by the Tazama Pipeline Limited a company that is jointly owned by the Government of Zambia (66.7%) and Government of Tanzania (33.3%). It was built in 1968 but now requires upgrading

History

https://www.znbc.co.zm/news/zambiatanzania-consider-gas-pipeline/

Capacities

1100000000 Litres Oil Day

Finance

Operators

logo
Government of Zambia
Government
logo
Government of Tanzania
Government

Contractors

Unknown Private Sector
Company