Construction of a 1,320 MW (2 × 660 MW) supercritical coal-fired independent power plant at Paschim Gandamara, Banskhali Upazila, together with a dedicated coal unloading wharf, associated generation facilities and auxiliary infrastructure.
Capacities
1320
mw
Electricity
Finance
$1782000000 loan
Bank of China
Bank
Operators
SS Power I Limited
Company
Contractors
Shandong Electric Power Construction Corporation III