7th Bangladesh–China Friendship Bridge Construction Project
intraUrban
Cities
Madaripur
Bangladesh
Distance
0.7km
new
0.7km
rehabilitated
– km
existing
– km
Cost
$37.7m
$37,730,000
Phases
operational, 2015
Objective
Description
Construction of the 700 m Kazirtek (Asmot Ali Khan) Bridge over the Arial Khan River, linking Madaripur and Shariatpur districts on the Madaripur–Shariatpur–Chandpur highway and improving regional connectivity in southern Bangladesh.