Atlas Corridor
Component

Thang Long Coal-Fired Power Plant

power

Cities

Hoanh Bo
Viet Nam

Cost

$0.8b
$800,000,000

Phases

operational, 2018

Objective

Description

Construction of a coal-fired independent power plant with two 300 MW circulating-fluidized-bed units, often reported as 600 MW nominal or 620 MW gross capacity. Wuhan Kaidi was the principal Chinese EPC contractor and Alstom supplied the boilers; financing combined a syndicated buyer's-credit facility with Vietnamese sponsor equity.

Finance

logo
$600000000 loan
China Development Bank Development bank

Contractors

logo
Alstom
Company