Tanjung Kidurong Combined-Cycle Gas-Fired Power Plant Expansion
power
Cities
Bintulu
Malaysia
Cost
$0.7b
$704,500,000
Phases
operational, 2022
Objective
Description
Construction of two combined-cycle gas-turbine blocks at the existing Tanjung Kidurong power station, with a current gross capacity of 842 MW, subsea cooling-water pipelines, a gas-insulated substation and a 275 kV grid connection.