Savannakhet–Saravan Road No. 2.6313 Upgrading Project

road

Cities

Savannakhet
Lao People's Democratic Republic
Saravan
Lao People's Democratic Republic

Distance

88.2km
new
– km
rehabilitated
88.2km
existing
– km

Cost

$59.8m
$59,780,500

Phases

operational, 2021

Objective

Description

Upgrade of 88.2 km of Road No. 2.6313 between Thapangthong and Toumlan, linking National Road 13 South with NR1G. Works included asphalt surfacing, 19 concrete bridges, culverts, traffic signs, safety fencing and an agricultural technical training centre.