Atlas Corridor
Component

National Road 214 and Stung Treng Mekong Bridge

road

Cities

Stung Treng
Cambodia
Tbeng Meanchey
Cambodia

Distance

145km
new
145km
rehabilitated
– km
existing
– km

Cost

$116m
$116,000,000

Phases

operational, 2015

Objective

Description

Construction of 143.412 km of National Road 214 from National Road 7 in Stung Treng to National Road 62 in Preah Vihear, together with a 1.731 km Mekong bridge at Stung Treng. The package created a strategic east–west road connection across the Mekong.

Finance

logo
$113442000 loan
Exim Bank of China Development bank

Contractors

logo
Shanghai Construction Group
Company