Cost
$139.9m
$139,900,000
Objective
Description
The project involves the (a) installation of forty, EN121, 2.5MW wind turbine units and electrical equipment (including a booster station and a complex building); and (b) the construction of an 8.6 km 110kV single circuit line connecting to an existing substation (the Opornaya transformer substation owned by KEGOG). Capacities
100
MW
Electricity
Finance
$34400000 loan
Asian Infrastructure Investment Bank
Development bank
$24800000 loan
European Bank for Reconstruction and Development
Development bank
$22900000 loan
Green Climate Fund
Bank
$13300000 loan
Industrial and Commercial Bank of China
Bank