Atlas Corridor
Component

Zhanatas Wind Power Project

power

Cities

Taraz
Kazakhstan

Cost

$139.9m
$139,900,000

Phases

operational, 2021

Objective

Description

The project involves the (a) installation of forty, EN121, 2.5MW wind turbine units and electrical equipment (including a booster station and a complex building); and (b) the construction of an 8.6 km 110kV single circuit line connecting to an existing substation (the Opornaya transformer substation owned by KEGOG).

Capacities

100 MW Electricity

Finance

logo
$34400000 loan
Asian Infrastructure Investment Bank Development bank
logo
$24800000 loan
European Bank for Reconstruction and Development Development bank
logo
$22900000 loan
Green Climate Fund Bank
logo
$13300000 loan
Industrial and Commercial Bank of China Bank

Contractors

logo
Syno-Hydro
Company