Kazakhstan southern gas pipeline

pipelineGas

Cities

Beineu
Kazakhstan
Bozoi
Kazakhstan
Shymkent
Kazakhstan

Cost

$3.6b
$3,600,000,000

Phases

operational, 2017

Objective

Description

The Beineu-Bozoi-Shymkent Gas Pipeline is a 1,454 km long gas pipeline that runs through the Mangistau, Aktyubinsk, Kyzylorda and South Kazakhstan regions.The purpose of the project was to ensure stable gas demand in the southern Kazakhstan, reduce dependence on imported gas and ensure the energy security of Kazakhstan.

History

The first phase of the Beineu-Bozoi-Shymkent Gas Pipeline Project commenced on July 17, 2012. The project was originally expected to be completed by the end of 2012. It was ultimately completed on September 7, 2013, resulting in a throughput capacity of up to 10 bcm per year. The second phase of the Beineu-Bozoi-Shymkent Gas Pipeline Project involved 306.3 km of gas pipeline construction from Beineu settlement in the Mangystau Region to Bozoi settlement in the Aktobe Region. It also involved the installation of pipeline facilities, such as: compressor station CS-4 Karaozek in the Kyzylorda Region, Beineu gas metering station in Mangystau Region, the SCADA central dispatch control in Kyzylorda, and gas pipeline construction in Mangystau, Aktobe, Kyzylorda and South Kazakhstan regions. It was completed on December 30, 2016.

Finance

logo
$1250000000 loan
China Development Bank Development bank
logo
$1250000000 loan
Bank of China Bank

Operators

logo
KazTransGas
Company
logo
China National Petroleum Corporation
Company

Contractors

logo
China National Petroleum Corporation
Company