CAREC Corridors 2, 3, and 5 Road Project (M41 highway)
road
Cities
Obigarm
Tajikistan
Nurobod
Tajikistan
Distance
75km
new
75km
rehabilitated
– km
existing
– km
Cost
$368.1m
$368,100,000
Phases
underConstruction, 2025
Objective
"Connectivity and safety along the Obigarm–Nurobod road improved" - ADB
Description
The project involves the construction of a 72-kilometer bypass road section along the Obigarm-Nurobod route, which will replace the portion of the existing M41 highway that is expected to be submerged once the Rogun hydropower plant reservoir reaches its operational level. The new road will provide a critical alternative connection between Dushanbe and northeastern Tajikistan, avoiding a potential 500-kilometer detour.
Finance
$110000000 grant
Asian Development Bank
Bank
$40000000 loan
Asian Infrastructure Investment Bank
Development bank
$150000000 loan
European Bank for Reconstruction and Development
Development bank
$40000000 loan
OPEC Fund for International Development
Development bank